Journal Papers

2024

Jacobsen, E.L., Teizer, J., Wandahl, S., Brilakis, I. (2024). “Probabilistic forecasting of construction labor productivity metrics.” ITcon, 29, 58-83, https://dx.doi.org/10.36680/j.itcon.2024.004

Teizer, J., Migliaccio, G.C., Soliu, I., Golovina, O. (2024). “Relationship between Subcontracting Models and Adoption of Innovative Methods in Construction Safety.” Journal of Legal Affairs and Dispute Resolution in Engineering and Construction.

Johansen, K.W., Hong, K., Schultz, C., Teizer, J. (2024). “Automated Quantification of Construction Workers’ Exposure to Struck-by Falling Object Hazards”. Management, Procurement and Law.

Babazadeh, N., Teizer, J., Bargstädt, H.-J., Melzner, J. (2024). “Predictive simulation of construction site noise emissions from heavy equipment.” Smart and Sustainable Built Environment, https://doi.org/10.1108/SASBE-08-2023-0226

Johansen, K,W., Schultz, C., Teizer, J. (2024). “Automated performance assessment of prevention through design and planning (PtD/P) strategies in construction.” Automation in Construction, 157, 105159, https://doi.org/10.1016/j.autcon.2023.105159

 

2023

Jacobsen, E.L., Teizer, J., Wandahl, S. (2023). “Work estimation of construction workers for productivity monitoring using kinematic data and deep learning.” Automation in Construction, 152, 104932, https://doi.org/10.1016/j.autcon.2023.104932

Johansen, K.W., Schultz, C., Teizer, J. (2023). “Hazard ontology and 4D benchmark model for facilitation of automated construction safety requirement analysis activities.” Computer-Aided Civil and Infrastructure Engineering, 38(15), 2128-2144, https://doi.org/10.1111/mice.12988

 

2022

Jelonek, M., Fiala, E., Hermann, T., Teizer, J., Embers, S., Koenig, M., Mathis, A. (2022). “Evaluating Virtual Reality Simulations for Construction Safety Training – A User Study Exploring Learning Effects, Usability and User Experience.” Journal of Interactive Media, 21(2), 269-281, https://doi.org/10.1515/icom-2022-0006

Lerche, J., Lindhard, S., Enevoldsen, P., Neve, H.N., Møller, D.E., Jacobsen, EL., Teizer, J., Wandahl, S. (2022). “Causes of delay in offshore wind turbine construction projects.” Production Planning & Control, https://doi.org/10.1080/09537287.2022.2026673

Lerche, J., Lindhard, S., Enevoldsen, P., Velaaydan, Teizer, J., Neve, H., Wandahl, S. (2022). “What can be learned from variability in offshore wind projects.” Energy Strategy Reviews, 39, 100794, https://doi.org/10.1016/j.esr.2021.100794

Li, B., Schultz, C., Teizer, J., Golovina, O., Melzner, J. (2022). “Towards a unifying domain model of construction safety, health and well-being: SafeConDM”. Advanced Engineering Informatics, 51, 101487, https://doi.org/10.1016/j.aei.2021.101487

Wolf., M., Teizer, J., Wolf, B., Bükrü, S., Solberg, A. (2022). “Investigating hazard recognition in augmented virtuality for personalized feedback in construction safety education and training.” Advanced Engineering Informatics, 51, 101469, https://doi.org/10.1016/j.aei.2021.101469

Jacobsen, E.J., Teizer, J. (2022). “Deep learning in construction: A review of applications and potential avenues.” Computing in Civil Engineering, 36(2), 03121001, https://doi.org/10.1061/(ASCE)CP.1943-5487.0001010

 

2021

Jacobsen, E.J., Solberg, A., Golovina, O., Teizer, J. (2021). “Active Personalized Construction Safety Training using Run-Time Data Collection in Physical and Virtual Work Environments.” Construction Innovation: Information, Process, Management, http://dx.doi.org/10.1108/CI-06-2021-0113

Golovina, O., Teizer, J., Johansen, K.W., König, M. (2021). “Towards Autonomous Cloud-based Close Call Data Management for Construction Equipment Safety.” Automation in Construction, 132, 103962, https://doi.org/10.1016/j.autcon.2021.103962

Johansen, K., Nielsen, R., Schultz, C., Teizer, J. (2021). “Automated activity and progress analysis based on non-monotonic reasoning of construction operations.” Smart and Sustainable Built Environment, https://doi.org/10.1108/SASBE-03-2021-0044

 

2020

Neve, H., Wandahl, S., Lindhard, S., Teizer, J., Lerche, J. (2020). “Learning to see value-adding and non-value-adding work time in refurbishment production systems.” Production Planning and Control,
https://doi.org/10.1080/09537287.2020.1843730

Lerche, J., Neve, H., Ballard, G., Teizer, J., Wandahl, S., Gross, A. (2020). “Application of Last Planner System to modular offshore wind construction.” Journal of Construction Engineering and Management, 146(11), 05020015, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001922

Teizer, J., Neve, H., Li, H., Wandahl, S., König, J., Ochner, B., König, M., Lerche, J. (2020). “Construction resource efficiency improvement by long range wide area network tracking and monitoring.” Automation in Construction, 116, 103245, https://doi.org/10.1016/j.autcon.2020.103245

Neve, H.H., Wandahl, S., Lindhard, S., Teizer, J., Lerche, J. (2020). “Determining the relationship between direct work and construction labor productivity in North America: Four decades of insights”, Journal of Construction Engineering and Management, ASCE, 146(9), 04020110, https://doi.org/10.1061/(ASCE)CO.1943-7862.0001887

 

2019

Teizer, J., Melzner, J. (2019). “Neue Wege zur Integration von BIM, IoT und Lean Construction in der Bauingenieurausbildung“, VDI-Bautechnik, Jahresausgabe 2019/20, Bauingenieur, Springer, October 2019, 19-25, ISSN 0005-6650

Golovina, O., Perschewski, M., Teizer, J., König, M. (2019). “Algorithm for Quantitative Analysis of Close Call Events and Personalized Feedback in Construction Safety”, Automation in Construction, 99, 206-222, https://doi.org/10.1016/j.autcon.2018.11.014

Schwabe, K., Teizer, J., König, M. (2019). “Applying rule-based model-checking to construction site layout planning tasks”, Automation in Construction, 97, 205-219, https://doi.org/10.1016/j.autcon.2018.10.012

 

2018

Golovina, O., Teizer, J., Rauth, F., König, M. (2018) . “Proaktive Magnetfeldtechnologie zur Unfallvermeidung an Baumaschinen”, VDI-Bautechnik, Jahresausgabe 2017/18, Bauingenieur, Springer, October 2018, ISSN 0005-6650, 52-67

Teizer, J., Wolf, M., König, M. (2018) . “Mixed Reality Anwendungen und ihr Einsatz in der Aus- und Weiterbildung kapitalintensiver Industrien”, VDI-Bautechnik, Jahresausgabe 2017/18, Bauingenieur, Springer, October 2018, ISSN 0005-6650, 73-82

Teizer, J. (2018) . “ISARC 2018: Internationale Konferenz und Hackathon zur Automatisierung und Robotik im Bauwesen”, VDI-Bautechnik, Jahresausgabe 2017/18, Bauingenieur, Springer, October 2018, ISSN 0005-6650, 83-85

 

2017

Teizer, J., Melzner, J., Wolf, M., Golovina, O., König, M. (2017). “Automatisierte 4D-Bauablaufvisualisierung und Ist-Datenerfassung zur Planung und Steuerung von Bauprozessen”, VDI-Bautechnik, Jahresausgabe 2016/17, Bauingenieur, Springer, October 2017, ISSN 0005-6650, 129-135

Teizer, J., Blickle, A., König, M., Mattern, H., King, T., Leitzbach, O. (2017). “3D Druck im Sonderschalungsbau”, VDI-Bautechnik, Jahresausgabe 2016/17, Bauingenieur, Springer, October 2017, ISSN 0005-6650, 119-128

Kassem, M., Benomran, L., Teizer, J. (2017). “Virtual environments for safety learning in construction and engineering: seeking evidence and identifying gaps for future research”, Visualization in Engineering, Springer, 5:16, http://doi.org/10.1186/s40327-017-0054-1

Bügler, M., Borrmann, A., Vela, P.A., Teizer, J. (2017). “Fusion of Photogrammetry and Video Analysis for Productivity Assessment of Earthwork Processes”, Computer-Aided Civil and Infrastructure Engineering, Wiley, 32(2), 107–123, http://doi.org/10.1111/mice.12235

 

2016

Golovina, O., Teizer, J., Pradhananga, N. (2016). “Heat Map Generation for Predictive Safety Planning: Preventing Struck-by and Near Miss Interactions between Workers-on-Foot and Construction Equipment”, Automation in Construction, 71, 99-115, http://dx.doi.org/10.1016/j.autcon.2016.03.008

Teizer, J. (2016). “Right-time vs. Real-time Pro-active Construction Safety and Health System Architecture”, Construction Innovation: Information, Process, Management,  16(3), 253-280, http://dx.doi.org/10.1108/CI-10-2015-0049

Kuenzel, R., Teizer, J., Mueller, M., Blickle, A. (2016). “SmartSite: Intelligent and Autonomous Environments, Machinery, and Processes to Realize Smart Road Construction Projects”, Automation in Construction, 71, 21-33, http://dx.doi.org/10.1016/j.autcon.2016.03.012

Ray, S.J., Teizer, J. (2016). “Dynamic Blindspots Measurement for Construction Equipment Operators”, Safety Science, 85, 139-151, http://dx.doi.org/10.1016/j.ssci.2016.01.011

 

2015

Costin, A.M., Teizer, J. (2015). “Fusing passive RFID and BIM for increased accuracy in indoor localization”, Visualization in Engineering, Springer, 3:17, http://dx.doi.org/10.1186/s40327-015-0030-6

Costin, A.M., Teizer, J., Schoner, B. (2015). “RFID and BIM-enabled worker location tracking to support real-time building protocol control and data visualization”, ITcon, 20, 495-517, http://www.itcon.org/2015/29

Teizer, J., Cheng, T. (2015). “Proximity hazard indicator for near miss location recording and mapping of workers-on-foot interactions with construction equipment and geo-referenced hazard areas”, Automation in Construction, 60, 58-73, http://dx.doi.org/10.1016/j.autcon.2015.09.003

Zhang, S., Teizer, J., Pradhananga, N., Eastman, C. (2015). “Workforce location tracking to model, visualize and analyze workspace requirements in building information models for construction safety planning”, Automation in Construction, 60, 74-86, http://dx.doi.org/10.1016/j.autcon.2015.09.009

Venugopal, M., Eastman, C.M.,  Teizer, J. (2015). “An ontology-based analysis of the industry foundation class schema for building information model exchanges”, Advanced Engineering Informaticshttp://dx.doi.org/10.1016/j.aei.2015.09.006

Blickle, A., Karstedt, H., Paulitsch, A., Teizer, J., Müller, M. (2015). “SmartSite: Smarte Technologien für den intelligenten Straßenbau”, VDI-Bautechnik, Jahresausgabe 2015/16, Bauingenieur, Springer, Heidelberg, 2015

Teizer, J., Melzner, J. (2015). “Sicherheitstechnische Planung von Hoch- und Ingenieurbauprojekten mithilfe von Bauwerksinformationsmodellen (BIM)“, VDI-Bautechnik, Jahresausgabe 2015/16, Bauingenieur, Springer, Heidelberg, 128-135

Pradhananga, N. and Teizer, J. (2015). “Cell-based Construction Site Simulation Model for Earthmoving Operations using Real-time Equipment Location Data”, Visualization in Engineering, Springer Verlag, 3:12, http://dx.doi.org/10.1186/s40327-015-0025-3

Teizer, J. (2015). “Wearable, Wireless Identification Sensing Platform: Self-Monitoring Alert and Reporting Technology for Hazard Avoidance and Training (SmartHat)”, Journal of Information Technology in Construction (ITcon), 20, 295-312, http://www.itcon.org/2015/19

Teizer, J. (2015). “Status Quo and Open Challenges in Vision-Based Sensing and Tracking of Temporary Resources on Infrastructure Construction Sites”, Advanced Engineering Informatics, Special Issue Infrastructure Computer Vision, 29(2), 225-238, http://dx.doi.org/10.1016/j.aei.2015.03.006

Zhang, S., Boukamp, F., and Teizer, J. (2015). “Ontology-Based Semantic Modeling of Construction Safety Knowledge: Towards Automated Safety Planning for Job Hazard Analysis (JHA)”, Automation in Construction,  52, 29-41, http://dx.doi.org/10.1016/j.autcon.2015.02.005

 

2014

Wang, J., Zhang, S., and Teizer, J. (2014). “Geotechnical and Safety Protective Equipment Planning Using Range Point Cloud Data and Rule Checking in Building Information Modeling”, Automation in Construction, 49, 250-261, http://dx.doi.org/10.1016 /j.autcon.2014.09.002

Vasenev, A., Pradhananga N., Bijleveld, F., Ionita, D., Hartmann T., Teizer, J., and Dorée, A. (2014). “An Information Fusion Approach for Filtering GNSS Data Sets collected during Construction Operations”, Advanced Engineering Informatics,  28, 297-310, http://dx.doi.org/10.1016/j.aei.2014.07.001

Zhang, S., Sulankivi, K., Kiviniemi, M., Romo, I., Eastman, C.M., and Teizer, J. (2015). “BIM-based Fall Hazard Identification and Prevention in Construction Safety Planning”, Safety Science, 72, 31-45, http://dx.doi.org/10.1016/j.ssci.2014.08.001

Siebert, S. and Teizer, J. (2014). “Mobile 3D Mapping for Surveying Earthwork Projects using an Unmanned Aerial Vehicle (UAV) System”, Automation in Construction, 41, 1–14, http://dx.doi.org/10.1016/j.autcon.2014.01.004

Stowe, K., Zhang, S., Teizer, J., and Jaselskis, E.J. (2014). “Capturing the Return on Investment of All-in Building Information Modeling: Structured Approach”, Practice Periodical on Structural Design and Construction, ASCE, Reston, Virginia, 20(1), 04014027, http://dx.doi.org/10.1061/(ASCE)SC.1943-5576.0000221

Kim, K., Teizer, J. (2014). “Automatic Design and Planning of Scaffolding Systems using Building Information Modeling”, Advanced Engineering Informatics, 28, 66-80, http://dx.doi.org/10.1016/j.aei.2013.12.002

Bostelman, R., Teizer, J., Ray, S.J., Agronind, M., and Albanesee, D. (2014). “Methods for Improving Visibility Measurement Standards of Powered Industrial Vehicles”, Safety Science, 62, 257-270, http://dx.doi.org/10.1016/j.ssci.2013.08.020

Yang, J., Vela, P.A., Teizer, J., and Shi, Z.K. (2014). “Vision-Based Crane Tracking for Understanding Construction Activity”, Journal of Computing in Civil Engineering, ASCE, 28(1), 103-112, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000242

Cheng, T. and Teizer, J. (2014). “Modeling Tower Crane Operator Visibility to Minimize the Risk of Limited Situational Awareness”, Journal of Computing in Civil Engineering, ASCE, 28(3), 04014004, http://ascelibrary.org/doi/abs/10.1061/(ASCE)CP.1943-5487.0000282

Arif, O., Ray, S.J., Vela, P.A., Teizer, J. (2014). “Potential of Time-of-Flight (TOF) Range Imaging for Object Manipulation and Identification in Construction”, Journal of Computing in Civil Engineering, ASCE, 28(6), 06014005, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000304

 

2013

Melzner, J, Teizer, J., Zhang, S., Bargstädt, H.-J. (2013). “Objektorientierte sicherheitstechnische Planung von Hochbauprojekten mit Hilfe von Bauwerksinformationsmodellen”, Bauingenieur, Springer VDI Verlag, November 2013, 11, 471-479

Ray, S.J., and Teizer, J. (2013). “Computing 3D Blind Spots of Construction Equipment: Implementation and Evaluation of an Automated Measurement and Visualization Method Utilizing Range Point Cloud Data”, Automation in Construction, 36, 95-107, http://dx.doi.org/10.1016/j.autcon.2013.08.007

Kelm, A., Laußat, L., Meins-Becker, A., Platz, D., Khazaee, M., Costin, A., Helmus, M. and Teizer, J. (2013). “Mobile Passive Radio Frequency Identification (RFID) Portal for Automated and Rapid Control of Personal Protective Equipment (PPE) on Construction Sites”, Automation in Construction, 36, 38-52, http://dx.doi.org/10.1016/j.autcon.2013.08.009

Teizer, J., Cheng, T., and Fang, Y. (2013). “Location Tracking and Data Visualization Technology to Advance Construction Ironworkers’ Education and Training in Safety and Productivity”, Automation in Construction, 35, 53-68, http://dx.doi.org/10.1016/j.autcon.2013.03.004

Marks, E. and Teizer, J. (2013). “Method for Testing Proximity Detection and Alert Technology for Safe Construction Equipment Operation”, Construction Management and Economics, Taylor & Francis, Special Issue on Occupational Health and Safety in the Construction Industry, 31(6), 636-646, http://www.tandfonline.com/doi/abs/10.1080/01446193.2013.783705

Melzner, J, Zhang, S., Teizer, J., and Bargstädt, H.-J. (2013). “A case study on automated safety compliance checking to assist fall protection design and planning in building information models”, Construction Management and Economics, Taylor & Francis, Special Issue on Occupational Health and Safety in the Construction Industry, 31(6), 661-674, http://www.tandfonline.com/doi/abs/10.1080/01446193.2013.780662

Marks, E., Cheng, T., and Teizer, J. (2013). “Laser Scanning for Safe Equipment Design that Increases Operator Visibility by Measuring Blind Spots”, Journal of Construction Engineering and Management, ASCE, 139, 1006-1014, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000690

Cheng, T., Teizer, J., Migliaccio, G.C., Gatti, U.C. (2013). “Automated Task-level Activity Analysis through Fusion of Real Time Location Sensors and Worker’s Thoracic Posture Data”, Automation in Construction, 29, 24-39, http://dx.doi.org/10.1016/j.autcon.2012.08.003

Cheng, T. and Teizer, J. (2013). “Real-time Resource Location Data Collection and Visualization Technology for Construction Safety and Activity Monitoring Applications”, Automation in Construction, 23, 3-15, http://dx.doi.org/10.1016/j.autcon.2012.10.017

Pradhananga, N. and Teizer, J. (2013). “Automatic Spatio-Temporal Analysis of Construction Equipment Operations using GPS Data”, Automation in Construction,29, 107-122, http://dx.doi.org/10.1016/j.autcon.2012.09.004

Zhang, S., Teizer, J., Lee, J.-K., Eastman, C., Venugopal, M. (2013). “Building Information Modeling (BIM) and Safety: Automatic Safety Checking of Construction Models and Schedules”, Automation in Construction, 29, 183-195, http://dx.doi.org/10.1016/j.autcon.2012.05.006

Cheng, T., Migliaccio, G.C., Teizer J., Gatti, U.C. (2013). “Data Fusion of Real-time Location Sensing (RTLS) and Physiological Status Monitoring (PSM) for Ergonomics Analysis of Construction Workers”, Journal of Computing in Civil Engineering, ASCE, 27(3), 320-335, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000222

 

2012

Marks, E. and Teizer, J. (2012). “Safety First: Real-Time Proactive Equipment Operator and Ground Worker Warning and Alert System in Steel Manufacturing”, Iron & Steel Technology, AIST, 9(10), 56-69, http://apps.aist.org/safetyfirst/12_oct_Safety%20First.pdf

Ray, S.J. and Teizer J. (2012). “Real-Time Construction Worker Posture Analysis for Ergonomics Training”, Advanced Engineering Informatics, 26, 439-455, http://dx.doi.org/10.1016/j.aei.2012.02.011

Thomas, S.J., Wheeler, E., Teizer, J., and Reynolds, M.S. (2012). “Quadrature Amplitude Modulated Backscatter in Passive and Semipassive UHF RFID Systems”. IEEE Transactions on Microwave Theory and Techniques, 60(4), 1175-1183, http://dx.doi.org/10.1109/TMTT.2012.2185810

Venugopal, M., Eastman, C.M., Sacks, R., and Teizer J. (2012). “Semantics of Model Views for Information Exchanges Using the Industry Foundation Class Schema”, Advanced Engineering Informatics, 26, 411-428, http://dx.doi.org/10.1016/j.aei.2012.01.005

Teizer, J., Venugopal, M., Teizer, W., and Felkl, J. (2012). “Nanotechnology and Its Impact on Construction: Bridging the Gap Between Researchers and Industry Professionals”, Journal of Construction Engineering and Management, ASCE, 138(5), 594-604, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000467

Costin, A., Pradhananga, N., and Teizer, J. (2012). “Leveraging Passive RFID Technology for Construction Resource Field Mobility and Status Monitoring in a High-Rise Renovation Project”, Automation in Construction, 24, 1-15, http://dx.doi.org/10.1016/j.autcon.2012.02.015

Ray, J.S., and Teizer, J. (2012). “Coarse Head Pose Estimation of Construction Equipment Operators to Formulate Dynamic Blind Spots”, Advanced Engineering Informatics, 26(1), 117–130, http://dx.doi.org/10.1016/j.aei.2011.09.005

Cheng, T., Mantripragada, U., Teizer, J., and Vela, P.A. (2012). “Automated Trajectory and Path Planning Analysis Based on Ultra Wideband Data,”  Journal of Computing in Civil Engineering, ASCE, 26, 151-160, http://dx.doi.org/10.1061/(ASCE)CP.1943-5487.0000115

 

2011

Yang J., Cheng, T., Teizer, J., Vela, P.A., Shi Z.K. (2011). “A Performance Evaluation of Vision and Radio Frequency Tracking Methods for Interacting Workforce”, Advanced Engineering Informatics, 25(4), 736-747, http://dx.doi.org/10.1016/j.aei.2011.04.001

Cheng, T., Venugopal, M., Teizer, J., and Vela, P.A. (2011). “Performance Evaluation of Ultra Wideband Technology for Construction Resource Location Tracking in Harsh Environments”, Automation in Construction, 20(8), 1173-1184, http://dx.doi.org/10.1016/j.autcon.2011.05.001

Golparvar-Fard M., Bohn J., Teizer J., Savarese S., and Peña-Mora F. (2011). “Evaluation of image-based modeling and laser scanning accuracy for emerging automated performance monitoring techniques”, Automation in Construction, 20(8), 1143-1155, http://dx.doi.org/10.1016/j.autcon.2011.04.016

Shahandashti, S.M., Razavi, S.N., Soibelman, L., Berges, M., Caldas, C.H., Brilakis, I., Teizer, J., Vela, P.A., Haas, C.T., Garrett, J., Akinci, B., and Zhu, Z. (2011). “Data Fusion Approaches and Applications for Construction Engineering“, Journal of Construction Engineering and Management, ASCE, 137(10), 863-869, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000287

Saidi, K.S., Teizer, J., Franaszek, M., and Lytle, A.M. (2011). “Static and Dynamic Performance Evaluation of a Commercially-Available Ultra Wideband Tracking System”, Automation in Construction, 20(5), 519-530, http://dx.doi.org/10.1016/j.autcon.2010.11.018

Hinze, J.W., and Teizer, J. (2011). “Visibility-Related Fatalities Related to Construction Equipment”, Journal of Safety Science, 49(5), 709-718, http://dx.doi.org/10.1016/j.ssci.2011.01.007

 

2010

Ndiour, I.J., Teizer, J., and Vela, P.A. (2010). “A Probabilistic Contour Observer for Online Visual Tracking”, SIAM Journal on Imaging Sciences, 3(4), 835-855, http://dx.doi.org/10.1137/100786629

Brilakis, I., Lourakis, M., Sacks, R., Savarese, S., Christodoulou, S., Teizer, J., and Makhmalbaf, A. (2010). “Toward Automated Generation of Parametric BIMs based on Hybrid Video and Laser Scanning Data”, Special Issue of the Journal of Advanced Engineering Informatics, 24(4), 456-465, http://dx.doi.org/10.1016/j.aei.2010.06.006

Yang, J., Arif, O., Vela, P.A., Teizer, J., and Shi, Z. (2010). “Tracking Multiple Workers on Construction Sites using Video Cameras”, Special Issue of the Journal of Advanced Engineering Informatics, 24(4), 428-434, http://dx.doi.org/10.1016/j.aei.2010.06.008

Teizer, J., Allread, B.S., Fullerton, C.E., and Hinze, J. (2010). “Autonomous Pro-Active Real-time Construction Worker and Equipment Operator Proximity Safety Alert System”, Automation in Construction, 19(5), 630-640, http://dx.doi.org/10.1016/j.autcon.2010.02.009

Teizer, J., Allread, B.S., and Mantripragada, U. (2010). “Automating the Blind Spot Measurement of Construction Equipment”. Automation in Construction, 19(4), 491-501, http://dx.doi.org/10.1016/j.autcon.2009.12.012

Bohn, J.S. and Teizer, J. (2010). “Benefits and Barriers of Construction Project Monitoring using Hi-Resolution Automated Cameras”. Journal of Construction Engineering and Management, ASCE, 136(6), 632-640, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000164

 

2009

Teizer, J. and Vela, P.A. (2009). “Personnel Tracking on Construction Sites using Video Cameras”. Advanced Engineering Informatics, Special Issue, 23(4), 452-462, http://dx.doi.org/10.1016/j.aei.2009.06.011

Garrett, J.W. and Teizer, J. (2009). “Human Factors Analysis Classification System Relating to Human Error Awareness Taxonomy in Construction Safety”. Journal of Construction Engineering and Management, ASCE, 135(8), 754-763, http://dx.doi.org/10.1061/(ASCE)CO.1943-7862.0000034

Teizer, J., Venugopal, M., and Walia, A. (2008). “Ultrawideband for Automated Real-time Three-Dimensional Location Sensing for Workforce, Equipment, and Material Positioning and Tracking”. Transportation Research Record: Journal of the Transportation Research Board, Washington D.C., No. 2081, 56-64, http://dx.doi.org/10.3141/2081-06

 

2008

Walia, A., and Teizer, J. (2008). “Analysis of Spatial Data Structures for Proximity Detection”, Journal of Tsinghua Science and Technology, 13(1), 102-107, http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=6072965

Teizer, J. (2008). “3D Range Imaging Camera Sensing for Active Safety in Construction”, Journal of Information Technology in Construction, Sensors in Construction and Infrastructure Management, 13 (Special Issue), 103-117, http://www.itcon.org/2008/8

Teizer, J. and Kahlmann, T. (2008). “Range Imaging as an Emerging Optical Three-Dimension Measurement Technology”. Transportation Research Record: Journal of the Transportation Research Board, Washington D.C., No. 2040, 19-29, http://doi.org/10.3141/2040-03

 

2007

Teizer, J., Caldas C.H., and Haas, C.T. (2007). “Real-Time Three-Dimensional Occupancy Grid Modeling for the Detection and Tracking of Construction Resources”. Journal of Construction Engineering and Management,  133(11), 880-888, http://dx.doi.org/10.1061/(ASCE)0733-9364(2007)133:11(880)

 

2005

Teizer, J., Kim, C., Haas, C.T., Liapi, K.A., and Caldas, C.H. (2005). “A Framework for Real-time 3D Modeling of Infrastructure”. Transportation Research Record: Journal of the Transportation Research Board, Washington D.C., No. 1913, 177-186, https://doi.org/10.1177/0361198105191300117